As a result, rainwater runoff from adjacent developments has increasingly flowed toward the
Belvedere Park premises, leading to periodic flooding at the entrance points and internal
areas of the condominium..
Recognizing the importance of long-term flood resilience, the Residents Welfare
Association (RWA) of Belvedere Park took proactive steps to implement an effective flood
protection solution to safeguard the community and its infrastructure from further damage to
property.
.
Following consultations and evaluation of appropriate flood mitigation systems, the RWA
partnered with Frontier Flood Barrier India (LLP) to implement the H-Frame Flood
Control Barrier System. This system was selected for its reliability, durability, and rapid
deployment capability during heavy rainfall or flood conditions. Each plank of 20cm high
can be added depending upon the height of the flood water.
The flood barriers were installed at the condominium’s two primary access points:
- • Main Entry Gate (IN Gate)
- • Main Exit Gate (OUT Gate)
Each entrance was equipped with a
6-meter-long flood barrier with a protection height of
1.4 meters, designed to effectively prevent external stormwater from entering the premises
during peak flooding events..
The civil works required to support the installation of the H-Frame flood barrier system were carried out by the Belvedere Park RWA, under the technical guidance and supervision of Frontier Flood Barriers India LLP..
The scope of civil preparation included:
- • Base preparation and levelling at both entrances including casting of floor beam
- • Constriction and positioning of anchor pillars for the H-Frame support brackets
- • Alignment and structural preparation for the barrier system
The civil works were completed at an exceptional pace, reflecting the RWA’s strong commitment and coordination in ensuring the successful implementation of the project
Following the completion of the civil infrastructure, the Frontier Flood Barriers team carried out the installation of the H-Frame flood control barriers at both entrances.
The installation process included:
- • Fixing of structural H-Frame supports to the side columns
- • Placement and alignment of barrier panels
- • Integration of sealing components
- • Inspection and operational verification of the barrier system
The project was executed efficiently and professionally, with close coordination between the Frontier Flood Barriers India LLP installation team and the Belvedere Park RWA.
The RWA’s active involvement and logistical support enabled the installation to be completed smoothly and within the planned timeline.
With the installation of the H-Frame Flood Control Barrier System, Belvedere Park now has a robust flood protection mechanism in place at its primary entry and exit points.
The installed system provides:
- • Effective protection against stormwater inflow during heavy rainfall
- • Rapid deployment capability during flood events
- • Durable and reliable flood defence infrastructure
- • Long-term protection for residents, property, and internal roadways
.png)
This installation significantly strengthens the condominium’s preparedness against recurring flooding and contributes to improved resilience during the monsoon season.
Frontier Flood Barriers India LLP extends its appreciation to the Residents Welfare Association (RWA) of Belvedere Park for their proactive leadership, efficient coordination, and full support throughout the project.
The collaborative approach between the RWA and Frontier Flood Barriers India LL ensured that both entrances were completed to the highest professional standards and within a remarkably short timeframe.